Development record
Both itd-115 and itd-2610110940216682 have abcd set up the merge queue when preparing a managed repository
Both itd-115 and itd-2610110940216682 have abcd set up the merge queue when preparing a managed repository
A scope leakage (severity minor) found by the cross-document consistency pass.
- End A:
.abcd/development/intents/drafts/itd-115-abcd-managed-repos-merge-prs-without-the.md:18— "the forge tests it combined with the current base" - End B:
.abcd/development/intents/drafts/itd-2610110940216682-a-person-whose-project-abcd-manages-gets.md:19— "The full suite, on every operating system the project supports, runs once per change, in the merge queue, on exactly what will land"
itd-115 has onboarding configure a merge queue that tests each PR against the current base. itd-2610110940216682 has abcd, when it prepares the repository, set up the queue (sized to the runners) where the full suite runs once per change. The same ground is claimed twice with different contents, so it is unclear which draft owns the queue configuration.
Evidence: .abcd/work/reviews/2026-10-26-consistency/00-summary.md, finding 1083.
Grounds
- declined: Closed in the 2026-10-27 triage (dcn-2610271112330536) as a duplicate of iss-2610262042399506. The same draft, itd-2610110940216682, claims 'abcd sets this up' over ground another draft already owns; here the other draft is itd-115 and the ground is the merge queue, and one edit to itd-2610110940216682 (builds_on both, define the shape only) settles it.
Frontmatter
| id | iss-2610262042381184 |
|---|---|
| type | issue |
| lifecycle | wontfix |
| severity | minor |
.abcd/work/issues/wontfix/iss-2610262042381184-both-itd-115-and-itd-2610110940216682.md
open on GitHub ↗ · commit history ↗
References2
- itd-115A Ready PR Merges Without Ever Wedging BEHINDrelated
- itd-2610110940216682Every change is checked in full once, on exactly what landsrelated
mentions2
- dcn-26102711123305362026-10-27 — The product thinker accepted on 2026-10-27 the triage of the 1301 records the 2026-10-26 consistency pass filed. The duplicates, the records a later record already settles, the ones that are no contradiction and the one already fixed are closed with each reader's reason. Every other record gets its fix as its remedy, the rulings' accepted answers included, so a drain can take it. The 45 major records left open are deferred past v0.15.1, because the brief's single-home rewrite rewrites or removes most of the passages they quote. The person ruled the major rulings one at a time; the minor rulings take their recommended answers.
- iss-2610262042399506itd-106 and itd-2610110940216682 each scaffold the managed repository's CI workflow, to different shapes