Development record
itd-34 routes a standalone intent to a flow-next spec, while itd-37 places the spec template in abcd's native Go binary
itd-34 routes a standalone intent to a flow-next spec, while itd-37 places the spec template in abcd's native Go binary
A premise contradiction (severity minor) found by the cross-document consistency pass.
- End A:
.abcd/development/intents/disciplines/itd-37-modification-grammar.md:55— "carried by the native spec template in the Go binary" - End B:
.abcd/development/intents/shipped/itd-34-three-intent-kinds.md:21— "A standalone intent maps 1:1 to a flow-nextspec"
itd-34 states that a standalone intent maps 1:1 to a flow-next spec and is planned through /flow-next:plan and plan-review; itd-37 says every spec carries its Modification Grammar section through the native spec template in the Go binary. The two name different spec stores and planning paths for the same promotion, so a builder cannot tell which one intent plan mints into or which template carries the inherited gates.
Evidence: .abcd/work/reviews/2026-10-26-consistency/00-summary.md, finding 1134.
Grounds
- declined: Closed in the 2026-10-27 triage (dcn-2610271112330536): a later record already settles which end holds. itd-34 was written when a standalone intent mapped to a flow-next spec; adr-26 later made the native minimal spec layer the default, and itd-37's native spec template follows it. A shipped record keeps its period wording.
Frontmatter
| id | iss-2610262043232891 |
|---|---|
| type | issue |
| lifecycle | wontfix |
| severity | minor |
.abcd/work/issues/wontfix/iss-2610262043232891-itd-34-routes-a-standalone-intent-to-a.md
open on GitHub ↗ · commit history ↗
References2
mentions2
- adr-26A native minimal spec layer with the companion harness `ccpm` as the primary deeper backend
- dcn-26102711123305362026-10-27 — The product thinker accepted on 2026-10-27 the triage of the 1301 records the 2026-10-26 consistency pass filed. The duplicates, the records a later record already settles, the ones that are no contradiction and the one already fixed are closed with each reader's reason. Every other record gets its fix as its remedy, the rulings' accepted answers included, so a drain can take it. The 45 major records left open are deferred past v0.15.1, because the brief's single-home rewrite rewrites or removes most of the passages they quote. The person ruled the major rulings one at a time; the minor rulings take their recommended answers.