itd-2610070550516046 requires build-next to be reconciled with it before either is built, but itd-2609211116005482 has already shipped
itd-2610070550516046 requires build-next to be reconciled with it before either is built, but itd-2609211116005482 has already shipped
A sequencing impossibility (severity minor) found by the cross-document consistency pass.
- End A:
.abcd/development/intents/drafts/itd-2610070550516046-on-abcd-s-dashboard-a-product-thinker.md:44— "This reverses the design of itd-2609211116005482 (planned), whose pick scores only facts each intent's record holds; that intent must be reconciled with this one before either is built" - End B:
.abcd/development/intents/shipped/itd-2609211116005482-abcd-build-next-picks-the-readiest.md:20— "chooses the next intent to build, says why on the record, and builds it"
The draft calls itd-2609211116005482 planned and says that intent must be reconciled with this one before either is built. The record holds it in shipped/, where it already chooses the next intent to build and builds it. The order the draft depends on can no longer happen; the reconciliation now has to amend a delivered pick, not a plan.
Evidence: .abcd/work/reviews/2026-10-26-consistency/00-summary.md, finding 1139.
Grounds
- declined: Closed in the 2026-10-27 triage (dcn-2610271112330536) as a duplicate of iss-2610262037208650. Same End A line; End B here is the shipped intent itself rather than the 34-build chapter.
Frontmatter
| id | iss-2610262043273885 |
|---|---|
| type | issue |
| lifecycle | wontfix |
| severity | minor |
.abcd/work/issues/wontfix/iss-2610262043273885-itd-2610070550516046-requires-build-next.md
open on GitHub ↗ · commit history ↗
References2
- itd-2609211116005482`abcd build next` picks the readiest planned intent itself, and writes down whyrelated
- itd-2610070550516046On the dashboard, a product thinker sees the brief and their ideas together, and puts the ideas in orderrelated
mentions2
- dcn-26102711123305362026-10-27 — The product thinker accepted on 2026-10-27 the triage of the 1301 records the 2026-10-26 consistency pass filed. The duplicates, the records a later record already settles, the ones that are no contradiction and the one already fixed are closed with each reader's reason. Every other record gets its fix as its remedy, the rulings' accepted answers included, so a drain can take it. The 45 major records left open are deferred past v0.15.1, because the brief's single-home rewrite rewrites or removes most of the passages they quote. The person ruled the major rulings one at a time; the minor rulings take their recommended answers.
- iss-2610262037208650itd-2610070550516046 requires the pick's intent to be reconciled with it before either is built; the pick is already built and shipped as build next.