This is the record of an abcd-managed repository

abcdBetav0.16.2 · 2026-11-06

Development record

itd-25's dredge promote calls /abcd:intent new, which itd-2609212130136102 removed

issuewontfixminoriss-2610262043297244

itd-25's dredge promote calls /abcd:intent new, which itd-2609212130136102 removed

A sequencing impossibility (severity minor) found by the cross-document consistency pass.

  • End A: .abcd/development/intents/drafts/itd-25-dredge-cross-corpus-synthesist.md:36 — "calls /abcd:intent new with the cluster summary"
  • End B: .abcd/development/intents/shipped/itd-2609212130136102-abcd-s-verbs-consolidate-ahoy-s-three.md:40 — "version --check becomes update --check; intent new is removed"

itd-25 defines dredge promote as calling /abcd:intent new with the cluster summary. The shipped verb consolidation removes intent new outright. The draft depends on a verb the shipped record deleted, so its promotion path has nothing to call as written.

Evidence: .abcd/work/reviews/2026-10-26-consistency/00-summary.md, finding 1141.

Grounds

  • declined: Closed in the 2026-10-27 triage (dcn-2610271112330536) as a duplicate of iss-2610262031315138. Same draft edit as iss-2610262031315138, set against a different statement of the same current state.

Frontmatter

idiss-2610262043297244
typeissue
lifecyclewontfix
severityminor

References2

mentions2