This is the record of an abcd-managed repository

abcdBetav0.16.2 · 2026-11-06

Development record

Two records build and publish a managed project's record site at each release by different routes: the shipped provider adapter, and the planned GitHub Pages route

issueopenmajoriss-2610262044347395

Two records build and publish a managed project's record site at each release by different routes: the shipped provider adapter, and the planned GitHub Pages route

A scope leakage (severity major) found by the cross-document consistency pass.

  • End A: .abcd/development/intents/planned/itd-2610091010348892-anyone-who-opens-abcdev-app-finds-the.md:20 — "The project's own workflow builds it and GitHub hosts it; abcd runs nothing."
  • End B: .abcd/development/intents/shipped/itd-2609061543533170-abcd-sets-up-a-managed-repository-s.md:42 — "one adapter ships (the provider abcd's own site uses); a second is a later intent, not a change to the verb"

itd-2609061543533170 shipped one verb that sets up a managed repository's site through a provider adapter, the provider abcd's own site uses. itd-2610091010348892 publishes an opted-in project's record on its own GitHub Pages through the project's workflow, with abcd running nothing, and moves abcd's own record to that route. Neither record names the other, so the same ground is covered twice with different hosts.

Evidence: .abcd/work/reviews/2026-10-26-consistency/00-summary.md, finding 1215.

Deferral 2026-10-27

Deferred past v0.15.1: Deferred by the product thinker on 2026-10-27 (dcn-2610271112330536): the brief's single-home rewrite (dcn-2610271112339516, dcn-2610271112330235) rewrites or removes most of the passages this record quotes.

Frontmatter

idiss-2610262044347395
typeissue
lifecycleopen
severitymajor

References2

mentions3