Development record
The board intent calls an intent listed under both Now and Next a defect, but the shipped status block lists the pick head in both by construction
The board intent calls an intent listed under both Now and Next a defect, but the shipped status block lists the pick head in both by construction
A premise contradiction (severity minor) found by the cross-document consistency pass.
- End A:
.abcd/development/intents/planned/itd-2610031214560142-when-you-type-abcd-in-a-terminal-or-ask.md:97— "the next-up intent listed under both Now and Next is the defect's (iss-2610031207397996)" - End B:
.abcd/development/intents/shipped/itd-2609212103568351-the-bare-abcd-status-board-and-the-site.md:39— "plus the head ofbuild next's pick order marked "next up", so Now is never empty while anything is READY"
itd-2610031214560142 treats the next-up intent appearing under both Now and Next as a defect (iss-2610031207397996). itd-2609212103568351 defines Now to include the head of build next's pick order marked 'next up', and Next as every READY intent in pick order, so the head is necessarily in both. The shipped design produces what the planned record calls a defect.
Evidence: .abcd/work/reviews/2026-10-26-consistency/00-summary.md, finding 1220.
Grounds
- declined: Closed in the 2026-10-27 triage (dcn-2610271112330536): a later record already settles which end holds. The tree no longer lists the head twice, so the planned board intent's decision 9 and the current brief agree; only the shipped intent's original scope sentence is out of date history.
Frontmatter
| id | iss-2610262044382852 |
|---|---|
| type | issue |
| lifecycle | wontfix |
| severity | minor |
.abcd/work/issues/wontfix/iss-2610262044382852-the-board-intent-calls-an-intent-listed.md
open on GitHub ↗ · commit history ↗
References2
- itd-2609212103568351The status board shows Now, Next and Later, computed from the recordrelated
- itd-2610031214560142The board shows a product thinker what waits on them and what comes next, in a few plain linesrelated
mentions2
- dcn-26102711123305362026-10-27 — The product thinker accepted on 2026-10-27 the triage of the 1301 records the 2026-10-26 consistency pass filed. The duplicates, the records a later record already settles, the ones that are no contradiction and the one already fixed are closed with each reader's reason. Every other record gets its fix as its remedy, the rulings' accepted answers included, so a drain can take it. The 45 major records left open are deferred past v0.15.1, because the brief's single-home rewrite rewrites or removes most of the passages they quote. The person ruled the major rulings one at a time; the minor rulings take their recommended answers.
- iss-2610031207397996The bare status board ignores the terminal's width: in an 81-column window the receipts line and every long intent title hard-wrap back to column 0, breaking the board's hanging indent (product thinker's screenshot, 2026-10-03). The same render indents rows at 2, 4, 6 and 10 columns, prints Go's raw true/true/[development work work.local] for the first three rows, and lists the next-up intent under both Now and Next, so it reads as a duplicate.