Development record
itd-124 keeps 'audit' for checking a promise and 'lint' for checking form; itd-65 calls its docs-lint row the documentation-auditor
itd-124 keeps 'audit' for checking a promise and 'lint' for checking form; itd-65 calls its docs-lint row the documentation-auditor
A terminology drift (severity nitpick) found by the cross-document consistency pass.
- End A:
.abcd/development/intents/shipped/itd-124-the-conformance-check-calls-itself-lint.md:22— "When a verb says lint I know it's checking form — no model, no judgement." - End B:
.abcd/development/intents/shipped/itd-65-launch-preflight-gate-suite.md:118— "documentation-auditorrow runs the docs-lint engine the front door"
itd-124 rules that a lint checks form with no model and no judgement, and that audit means checking whether we did what we said. itd-65's warn-tier documentation-auditor row runs the docs-lint engine, a deterministic form check, under the word itd-124 keeps for checking promises.
Evidence: .abcd/work/reviews/2026-10-26-consistency/00-summary.md, finding 1270.
Grounds
- declined: Closed in the 2026-10-27 triage (dcn-2610271112330536): the two ends do not conflict when read in full. internal/core/launch/gates.go still names the row documentation-auditor and it runs the deterministic docs-lint engine, which sits oddly beside itd-124's word rule, but the rule's acceptance criteria do not reach gate row names.
Frontmatter
| id | iss-2610262045222030 |
|---|---|
| type | issue |
| lifecycle | wontfix |
| severity | nitpick |
.abcd/work/issues/wontfix/iss-2610262045222030-itd-124-keeps-audit-for-checking-a.md
open on GitHub ↗ · commit history ↗
References2
mentions1
- dcn-26102711123305362026-10-27 — The product thinker accepted on 2026-10-27 the triage of the 1301 records the 2026-10-26 consistency pass filed. The duplicates, the records a later record already settles, the ones that are no contradiction and the one already fixed are closed with each reader's reason. Every other record gets its fix as its remedy, the rulings' accepted answers included, so a drain can take it. The 45 major records left open are deferred past v0.15.1, because the brief's single-home rewrite rewrites or removes most of the passages they quote. The person ruled the major rulings one at a time; the minor rulings take their recommended answers.