Development record
itd-34 says shape classification runs continuously in the pre-commit hook; itd-48 defers continuous pre-commit shape scanning
itd-34 says shape classification runs continuously in the pre-commit hook; itd-48 defers continuous pre-commit shape scanning
A premise contradiction (severity minor) found by the cross-document consistency pass.
- End A:
.abcd/development/intents/shipped/itd-34-three-intent-kinds.md:90— "It runs continuously via the pre-commit hook (writing findings to the latest report)" - End B:
.abcd/development/intents/shipped/itd-48-intent-fidelity-reviewer-roles-2-3.md:92— "Continuous pre-commit shape scanning is deferred to a"
itd-34 gives the reviewer's shape-classification role a continuous pre-commit run writing to the latest report, beside the on-demand verb. itd-48, which ships the same role as Role 3, defers continuous pre-commit scanning to a follow-up and calls that surface explicitly out of scope; its decision 1 also hands the shape role back to itd-34. Whether a commit runs the shape pass cannot be both.
Evidence: .abcd/work/reviews/2026-10-26-consistency/00-summary.md, finding 1281.
Grounds
- declined: Closed in the 2026-10-27 triage (dcn-2610271112330536): a later record already settles which end holds. No intent shape sub-verb or pre-commit hook exists in the CLI, and itd-34's banner narrows the record to the bundle command and reclassify; itd-48 says on-demand only with the continuous leg deferred.
Frontmatter
| id | iss-2610262045327872 |
|---|---|
| type | issue |
| lifecycle | wontfix |
| severity | minor |
.abcd/work/issues/wontfix/iss-2610262045327872-itd-34-says-shape-classification-runs.md
open on GitHub ↗ · commit history ↗
References2
mentions1
- dcn-26102711123305362026-10-27 — The product thinker accepted on 2026-10-27 the triage of the 1301 records the 2026-10-26 consistency pass filed. The duplicates, the records a later record already settles, the ones that are no contradiction and the one already fixed are closed with each reader's reason. Every other record gets its fix as its remedy, the rulings' accepted answers included, so a drain can take it. The 45 major records left open are deferred past v0.15.1, because the brief's single-home rewrite rewrites or removes most of the passages they quote. The person ruled the major rulings one at a time; the minor rulings take their recommended answers.