Development record
itd-2609212103565953 starts each step's lane only after the previous has merged; itd-2609201925079472 runs independent steps' lanes side by side
itd-2609212103565953 starts each step's lane only after the previous has merged; itd-2609201925079472 runs independent steps' lanes side by side
A premise contradiction (severity minor) found by the cross-document consistency pass.
- End A:
.abcd/development/intents/shipped/itd-2609212103565953-a-spec-lists-its-steps-and-the-build.md:40— "the next step's lane starts after the previous has merged" - End B:
.abcd/development/intents/shipped/itd-2609201925079472-an-autonomous-implementation-run-paces.md:57— "the lanes of steps that do not need each other run side by side"
itd-2609212103565953 says the build runs one lane per step in order and the next step's lane starts after the previous has merged. itd-2609201925079472 rules that a run works in parallel up to its ceiling, with the lanes of steps that do not need each other running side by side and a step's needs opted out per step. The step loop's ordering rule differs between the two shipped records.
Evidence: .abcd/work/reviews/2026-10-26-consistency/00-summary.md, finding 1292.
Grounds
- declined: Closed in the 2026-10-27 triage (dcn-2610271112330536): the two ends do not conflict when read in full. Read in full the two shipped records agree: sequential by default, parallel by opt-out.
Frontmatter
| id | iss-2610262045422454 |
|---|---|
| type | issue |
| lifecycle | wontfix |
| severity | minor |
.abcd/work/issues/wontfix/iss-2610262045422454-itd-2609212103565953-starts-each-step-s.md
open on GitHub ↗ · commit history ↗
References2
- itd-2609201925079472An autonomous run paces itself by default, and one flag sets the pacerelated
- itd-2609212103565953A spec lists its steps, and the build lands them one at a timerelated
mentions1
- dcn-26102711123305362026-10-27 — The product thinker accepted on 2026-10-27 the triage of the 1301 records the 2026-10-26 consistency pass filed. The duplicates, the records a later record already settles, the ones that are no contradiction and the one already fixed are closed with each reader's reason. Every other record gets its fix as its remedy, the rulings' accepted answers included, so a drain can take it. The 45 major records left open are deferred past v0.15.1, because the brief's single-home rewrite rewrites or removes most of the passages they quote. The person ruled the major rulings one at a time; the minor rulings take their recommended answers.