Development record
The board's Next list, which the product thinker picks build runs from, shows as ready two intents that abcd build refuses from the record alone, before any reservation is read: itd-50, whose spec spc-2609211924346308 has no ## Footprint packages line, and itd-39, whose ## Open Questions section the build counts as asking one question. The pick-order head skips such intents, but Next lists them unmarked, so a person who chooses from Next gets a refusal instead of a run and cannot tell the two kinds of ready apart.
issueopenminoriss-2610311224587853
The board's Next list, which the product thinker picks build runs from, shows as ready two intents that abcd build refuses from the record alone, before any reservation is read: itd-50, whose spec spc-2609211924346308 has no ## Footprint packages line, and itd-39, whose ## Open Questions section the build counts as asking one question. The pick-order head skips such intents, but Next lists them unmarked, so a person who chooses from Next gets a refusal instead of a run and cannot tell the two kinds of ready apart.
Frontmatter
| id | iss-2610311224587853 |
|---|---|
| type | issue |
| lifecycle | open |
| severity | minor |
.abcd/work/issues/open/iss-2610311224587853-the-board-s-next-list-which-the-product.md
open on GitHub ↗ · commit history ↗
mentions4
- dcn-26103112510136472026-10-31 — The product thinker ruled on 2026-10-31, on iss-2610311224587853, that the board's Next list shows only intents that pass the build's record-only pre-start checks; an intent that fails one (a spec with no footprint, an open question, a hold, an unsettled blocker, no step left) is listed under Later with the failing check named, as the pick head already treats it, and the issue is fixed as a defect rather than planned as an intent. Rejected: keeping such intents in Next marked with their failing check, since Next would mix buildable and blocked work; and promoting the issue to an intent, since Next would mislead until it shipped.
- itd-39abcd Surfaces the Right Memory at the Right Moment
- itd-50The Audit Loop Drives An Intent To Acceptance — Or Calls For A Replan
- spc-2609211924346308loop-toward-acceptance