Development record
The release workflow's verify job ran go test with no -timeout, so a package past go's 10-minute default failed the job with no test failing, after the merge queue had passed the same tree under a longer limit: on 2026-11-04 internal/core/implement/loop stopped the v0.16.1 release at 600 seconds, before the tag. The scaffolded release workflow carries the same step.
issueresolvedmajoriss-2611041016350835
The release workflow's verify job ran go test with no -timeout, so a package past go's 10-minute default failed the job with no test failing, after the merge queue had passed the same tree under a longer limit: on 2026-11-04 internal/core/implement/loop stopped the v0.16.1 release at 600 seconds, before the tag. The scaffolded release workflow carries the same step.
Frontmatter
| id | iss-2611041016350835 |
|---|---|
| type | issue |
| lifecycle | resolved |
| severity | major |
.abcd/work/issues/resolved/iss-2611041016350835-the-release-workflow-s-verify-job-ran-go.md
open on GitHub ↗ · commit history ↗