This is the record of an abcd-managed repository

abcdBetav0.16.2 · 2026-11-06

Development record

2026-08-15 — three forward plans adopted at a maintainer grill, absorbing the existing queue rather than adding to it: `2026-08-15-plugin-user-safety.md` (execution priority 1; owns install-experience Cut B pick-up and the v0.5.0 security remainder; fix queue opens iss-200 then iss-195), `2026-08-15-predictable-development.md` (priority 2; itd-109 promotion is the headline; absorbs the v0.5.0 consistency remainder), `2026-08-15-facilitator-experience.md` (continuous, rides along; supersedes the explainability plan's pick-up role). The plan 1/3 boundary is touch-vs-machinery: what a facilitator directly invokes or reads versus automation that guarantees behaviour without human action. Each plan admits items by a stated admission test with the ledger remaining the backlog of record. Same grill: iss-189/190 retired by SUPERSESSION, not wontfix — the defects are real, the local-patch avenue is exhausted (three BLOCKed rounds), so both resolve into the new iss-229 (the recorded 2026-08-08 galloping-probe/trueMatchEnd structural design) with their repros as its acceptance corpus; and itd-111's one-tap micro-prompt open question graduated to its own capture iss-230, homed in the facilitator plan. Rejected: wontfixing 189/190 (asserts the defects don't matter), a full 104-issue triage into the plans (stale mirror of the ledger), and executing the plans in the listed 1-2-3 order (the safety floor and the compounding accelerators come first).

decisiondcn-2608150000000001

2026-08-15 — three forward plans adopted at a maintainer grill, absorbing the existing queue rather than adding to it: 2026-08-15-plugin-user-safety.md (execution priority 1; owns install-experience Cut B pick-up and the v0.5.0 security remainder; fix queue opens iss-200 then iss-195), 2026-08-15-predictable-development.md (priority 2; itd-109 promotion is the headline; absorbs the v0.5.0 consistency remainder), 2026-08-15-facilitator-experience.md (continuous, rides along; supersedes the explainability plan's pick-up role). The plan 1/3 boundary is touch-vs-machinery: what a facilitator directly invokes or reads versus automation that guarantees behaviour without human action. Each plan admits items by a stated admission test with the ledger remaining the backlog of record. Same grill: iss-189/190 retired by SUPERSESSION, not wontfix — the defects are real, the local-patch avenue is exhausted (three BLOCKed rounds), so both resolve into the new iss-229 (the recorded 2026-08-08 galloping-probe/trueMatchEnd structural design) with their repros as its acceptance corpus; and itd-111's one-tap micro-prompt open question graduated to its own capture iss-230, homed in the facilitator plan. Rejected: wontfixing 189/190 (asserts the defects don't matter), a full 104-issue triage into the plans (stale mirror of the ledger), and executing the plans in the listed 1-2-3 order (the safety floor and the compounding accelerators come first).

Frontmatter

iddcn-2608150000000001
typedecision
date2026-08-15

mentions7