This is the record of an abcd-managed repository

abcdBetav0.16.2 · 2026-11-06

Development record

2026-09-21 — Phases and milestones are retired, and the word roadmap with them (product thinker, at an interactive interview after an independent research pass; adr-2609212115255771 supersedes adr-9). Sequencing is dependencies plus the lifecycle shelves, rendered as a Now / Next / Later status block on the `abcd` board and the site (itd-2609212103568351), never stored; the checkpoint is the derived release plus each intent's acceptance criteria, with an optional `target_release` the cut reports and moves forward (itd-2609212103572513); the unit below a spec is the step, a section not a family (itd-2609212103565953); an issue carries no spec by design; the batch is the run's internal order; one page maps the families (itd-2609211913453478). itd-24 becomes release retrospectives; itd-34 drops its phase rule. Same interview: `build` is the verb a person types and `implement` the loop (itd-2609201916151817 decision 8), the loop takes an issue key (decision 10), only the loop writes a verdict (decision 9); the person's command list is grouped with an agents block behind `--agent` (itd-146), every verb opens with a does/writes/refuses sentence (itd-2609212113220149), modes become flags and five checks one lint (itd-2609212130136102, breaking); the status-line badge is guarded and reset (itd-2609212130146198); a new capture or draft is matched and linked at filing, never refused (itd-2609212137116617); abcd's text names the product thinker or the technical facilitator and never the maintainer (itd-2609212137129937, captured for the run, no sweep today); the lab conventions become `abcd lab` (itd-2609212137128014); a managed repository's site goes live by one verb behind a provider seam (itd-2609061543533170).

decisiondcn-2609210000000001

2026-09-21 — Phases and milestones are retired, and the word roadmap with them (product thinker, at an interactive interview after an independent research pass; adr-2609212115255771 supersedes adr-9). Sequencing is dependencies plus the lifecycle shelves, rendered as a Now / Next / Later status block on the abcd board and the site (itd-2609212103568351), never stored; the checkpoint is the derived release plus each intent's acceptance criteria, with an optional target_release the cut reports and moves forward (itd-2609212103572513); the unit below a spec is the step, a section not a family (itd-2609212103565953); an issue carries no spec by design; the batch is the run's internal order; one page maps the families (itd-2609211913453478). itd-24 becomes release retrospectives; itd-34 drops its phase rule. Same interview: build is the verb a person types and implement the loop (itd-2609201916151817 decision 8), the loop takes an issue key (decision 10), only the loop writes a verdict (decision 9); the person's command list is grouped with an agents block behind --agent (itd-146), every verb opens with a does/writes/refuses sentence (itd-2609212113220149), modes become flags and five checks one lint (itd-2609212130136102, breaking); the status-line badge is guarded and reset (itd-2609212130146198); a new capture or draft is matched and linked at filing, never refused (itd-2609212137116617); abcd's text names the product thinker or the technical facilitator and never the maintainer (itd-2609212137129937, captured for the run, no sweep today); the lab conventions become abcd lab (itd-2609212137128014); a managed repository's site goes live by one verb behind a provider seam (itd-2609061543533170).

Frontmatter

iddcn-2609210000000001
typedecision
date2026-09-21

mentions17