Phases and milestones are retired: sequencing is dependencies rendered as status, the checkpoint is the derived release

adrsupersededadr-2609212115255771

Context

adr-9 (2026-05-16) made the phase the product layer between the brief and the intent: an ordered stretch of work bundling intents, ending in a milestone, a checkable end condition, recorded as a document under roadmap/phases/. Four months on, the record shows the layer thinned to a document nobody anchors to: no spec carries a phase: field (0 of 93), phase membership is recorded editorially in the phase document, and the roadmap rule "each phase ends in a milestone" names a unit no verb reads. Meanwhile three other groupings arrived with verbs behind them: the bundle (several intents sharing one spec because they ship as one change, itd-34), the derived release (the version computed from the impact of what shipped, the changelog composed from the records), and the autonomous run's batch. On 2026-09-21 the product thinker asked, in the interview that planned the fourteen specless intents, whether phases survive bundles and milestones survive releases.

An independent research pass over the field (Shape Up, Linear, GitHub, GitLab, SAFe, the Kanban Guide 2025, DORA, Firefox's trains, Kubernetes enhancement proposals, Now/Next/Later roadmaps, Cagan, release-please and changesets) found: every surviving sequencing unit is a timebox whose job is to carry a date, which this repository's roadmap rule forbids; the undated lineages run on priority, readiness and dependencies and name no sequencing unit; where a planned checkpoint survives beside derived releases it collapses into the release (Kubernetes' "milestone" is the release version, and the end condition sits on the record as graduation criteria, the role acceptance criteria play here); and Now/Next/Later, offered as a replacement, is already present under the names planned/ and drafts/ plus priority, so adding it as a stored unit would be a second name for one concept.

Decision

We retire the phase and the milestone as units of the record, and the word roadmap with them.

  1. Sequencing is dependencies plus the shelves. blocked_by and builds_on on the records (itd-78 derives a priority from them; the pick in abcd build next filters on them) and the lifecycle shelves drafts/ → planned/ → shipped/ carry the order. No stored unit sits above the intent for sequence.
  2. Now / Next / Later is a rendered status, never stored. The bare abcd board and the site's Status page compute it: Now is every intent in a lane (from the build's state file) plus the head of the pick order; Next is every planned intent the gate reports READY; Later is the rest of planned and the drafts. A started state comes from the state file and is rendered (itd-2609212103568351). Nothing is called a roadmap.
  3. The checkpoint is the derived release plus each intent's acceptance criteria. No planned end condition exists apart from them. An intent may carry an optional target_release: that the cut reports and moves forward, never refuses on (itd-2609212103572513); that field is the one forward-looking line the derived release keeps.
  4. The unit below a spec is the step: an ordered ## Steps section in the spec, each step landable as one lane and one pull request; a spec with no steps is one step; the loop's implement step and the section share the word (itd-2609212103565953). No fourth record family.
  5. Two axes, kept apart. The lifecycle (what has been decided about a record) lives in the folders and gates; the position (how soon) is rendered from it. planned/ is not renamed Now, because sixty planned intents are not all being worked on and the word would lie.
  6. Issues carry no spec by design. An issue's design record is its remedy: field and the failing test its lane writes first; an issue that needs design is an intent in disguise and is promoted.
  7. The batch is the run's internal order, derived from dependencies and the pick, and is not a term of the record.
  8. One term per concept. The glossary marks phase, milestone and roadmap superseded with their successors named, gains bundle and step, and one page maps the families (itd-2609211913453478). The phase documents stay in the tree as history with a retirement line; the ROADMAP rule domain is replaced by this decision's statement.

Alternatives Considered

  • Keep phases as the sequencing document, retire milestones only. Rejected: the document had already drifted to editorial membership with no anchor, the failure mode the research pass names for every hand-maintained sequencing unit; a unit no verb reads is a unit nobody keeps current.
  • Rename the folders to now/next/later/done. Rejected: the folders are a lifecycle the gates read (plan mints the spec on entering planned/), and the roadmap words are a position that changes without a decision; conflating them would either make Now lie or move the spec mint to lane start.
  • Now/Next/Later as a stored bucket on each record. Rejected: a second name for planned/, drafts/ and priority; the rendered form carries the same information and cannot drift.
  • A task record family below the spec. Rejected in favour of a section: a fourth family with folders and verbs adds the kind of vocabulary this decision trims; Shape Up's scopes and Kubernetes' in-record graduation criteria are the precedents for keeping the pieces inside the record.
  • Keep the word roadmap for the rendered view. Rejected on the repository's own documentation rule: a roadmap promises, this view reports; the docs are present tense, and the status board is where a reader already looks.

Consequences

  • adr-9 is superseded; the brief's mental-model chapter reads brief → intent → spec (→ steps), with the bundle as a delivery grouping and the derived release as the checkpoint (itd-2609211913453478 makes the edit).
  • itd-24 becomes release retrospectives: the release boundary is real and the changelog is a ready seed; itd-34 drops the rule that bundle members share a phase.
  • The run file's batches stay internal; its pull rule is priority plus dependency-readiness plus the ceiling.
  • The target_release: field, the ## Steps section, the status block and the glossary page are four intents planned on 2026-09-21 and built by the run; until they ship the folders are the only sequencing signal, which is the state the record was in already.
  • What is lost: the phase's ## Expectation, a working-backwards paragraph at release granularity. Its nearest home is a release press release composed from the shipped intents' press releases; the changelog composer is one step from it, and that step is not ruled here.