Development record
The out-of-scope page frames the brief as the work of eight planned phases; the reflect chapter says adr-2609212115255771 retired the phase.
The out-of-scope page frames the brief as the work of eight planned phases; the reflect chapter says adr-2609212115255771 retired the phase.
A premise contradiction (severity minor) found by the cross-document consistency pass.
- End A:
.abcd/development/brief/06-delivery/03-out-of-scope.md:3— "This brief describes the work bundled into the eight planned phases" - End B:
.abcd/development/brief/04-surfaces/09-reflect.md:13— "2609212115255771-phases-and-milestones-are-retired.md) retired the phase; itd-24 decisions 4 and 5)"
03-out-of-scope opens by saying the brief describes the work bundled into the eight planned phases, and later has an intent enter work by being scoped into a phase. 09-reflect says adr-2609212115255771 retired the phase, which is why a retrospective's grain is the release. If the phase is retired there are no planned phases for the brief's work to be bundled into, so one of the two premises is stale.
Evidence: .abcd/work/reviews/2026-10-26-consistency/00-summary.md, finding 434.
Grounds
- declined: Closed in the 2026-10-27 triage (dcn-2610271112330536) as a duplicate of iss-2610262040267270. Line 3 ('eight planned phases') and line 172 ('scoped into a phase') are the same stale premise in one page, against the same adr-2609212115255771 retirement.
Frontmatter
| id | iss-2610262033444397 |
|---|---|
| type | issue |
| lifecycle | wontfix |
| severity | minor |
.abcd/work/issues/wontfix/iss-2610262033444397-the-out-of-scope-page-frames-the-brief.md
open on GitHub ↗ · commit history ↗
mentions4
- adr-2609212115255771Phases and milestones are retired: sequencing is dependencies rendered as status, the checkpoint is the derived release
- dcn-26102711123305362026-10-27 — The product thinker accepted on 2026-10-27 the triage of the 1301 records the 2026-10-26 consistency pass filed. The duplicates, the records a later record already settles, the ones that are no contradiction and the one already fixed are closed with each reader's reason. Every other record gets its fix as its remedy, the rulings' accepted answers included, so a drain can take it. The 45 major records left open are deferred past v0.15.1, because the brief's single-home rewrite rewrites or removes most of the passages they quote. The person ruled the major rulings one at a time; the minor rulings take their recommended answers.
- iss-2610262040267270The out-of-scope page says a later intent enters work by being scoped into a phase; the build sequence says phases are retired and their documents are history.
- itd-24Completed Releases Get A Retrospective