Development record
itd-41 proposes ordered phases with Milestone and Phase Acceptance sections; the intent chapter says phases are retired.
itd-41 proposes ordered phases with Milestone and Phase Acceptance sections; the intent chapter says phases are retired.
A premise contradiction (severity major) found by the cross-document consistency pass.
- End A:
.abcd/development/intents/drafts/itd-41-phase-negotiator.md:30— "proposes an ordered set of phases, each with a draft## Expectation,## Milestone, and## Phase Acceptance" - End B:
.abcd/development/brief/04-surfaces/05-intent.md:95— "Phases are retired, and this check is what replaces the same-phase rule a bundle once carried"
itd-41 is a negotiator that proposes ordered phases, each with a draft ## Expectation, ## Milestone and ## Phase Acceptance. 05-intent.md says phases are retired, citing adr-2609212115255771 (phases and milestones are retired), and that a check now replaces the bundle's old same-phase rule. The intent's whole subject is missing from the planning model it would plug into.
Evidence: .abcd/work/reviews/2026-10-26-consistency/00-summary.md, finding 490.
Deferral 2026-10-27
Deferred past v0.15.1: Deferred by the product thinker on 2026-10-27 (dcn-2610271112330536): the brief's single-home rewrite (dcn-2610271112339516, dcn-2610271112330235) rewrites or removes most of the passages this record quotes.
Frontmatter
| id | iss-2610262034220886 |
|---|---|
| type | issue |
| lifecycle | open |
| severity | major |
.abcd/work/issues/open/iss-2610262034220886-itd-41-proposes-ordered-phases-with.md
open on GitHub ↗ · commit history ↗
References1
- itd-41abcd Tells You, Honestly, What a Phasing Choice Costsrelated
mentions7
- adr-2609212115255771Phases and milestones are retired: sequencing is dependencies rendered as status, the checkpoint is the derived release
- dcn-26102711123302352026-10-27 — The product thinker ruled on 2026-10-27 that the design brief shows the target design, in the present tense, with a status tag where a part is built, rather than the shipped state. With the ruling that behaviour lives in the command pages, the brief holds the product as aimed for and why, and the command pages hold what abcd does today. This reverses itd-147's currency rule, so a superseding ADR is owed, and the brief's checks are rebuilt around the status overlay.
- dcn-26102711123305362026-10-27 — The product thinker accepted on 2026-10-27 the triage of the 1301 records the 2026-10-26 consistency pass filed. The duplicates, the records a later record already settles, the ones that are no contradiction and the one already fixed are closed with each reader's reason. Every other record gets its fix as its remedy, the rulings' accepted answers included, so a drain can take it. The 45 major records left open are deferred past v0.15.1, because the brief's single-home rewrite rewrites or removes most of the passages they quote. The person ruled the major rulings one at a time; the minor rulings take their recommended answers.
- dcn-26102711123395162026-10-27 — The product thinker ruled on 2026-10-27 that each abcd command's behaviour is written once, in its command page, which agents follow when they run it. The brief's chapter for the command keeps why the command exists, its trade-offs and why it refuses what it does, with its sub-verb table and generated appendix, and points to the command page for behaviour. The documentation-fidelity check moves to the command pages. This reverses the behaviour half of adr-2609231028044006 and invariant 18, so a superseding ADR is owed.
- iss-2610262033041268itd-41 builds a negotiator over ordered phases with Expectation, Milestone and Phase Acceptance; the disembark page says sequence is dependencies plus the lifecycle shelves, and phases and milestones are retired.
- iss-2610262044017905The phase negotiator (itd-41) proposes and argues over roadmap phases; itd-24 records that phases are retired
- iss-2610262044146391The phase negotiator drafts phases, milestones and phase acceptance, but the shipped glossary intent retired phases and milestones