This is the record of an abcd-managed repository

abcdBetav0.16.2 · 2026-11-06

Development record

The phase negotiator drafts phases, milestones and phase acceptance, but the shipped glossary intent retired phases and milestones

issuewontfixmajoriss-2610262044146391

The phase negotiator drafts phases, milestones and phase acceptance, but the shipped glossary intent retired phases and milestones

A premise contradiction (severity major) found by the cross-document consistency pass.

  • End A: .abcd/development/intents/drafts/itd-41-phase-negotiator.md:30 — "proposes an ordered set of phases, each with a draft ## Expectation, ## Milestone, and ## Phase Acceptance"
  • End B: .abcd/development/intents/shipped/itd-2609211913453478-one-page-in-the-glossary-maps-abcd-s.md:55 — "Phases and milestones are retired; sequencing is dependencies plus the lifecycle shelves"

itd-41's whole deliverable is a proposed ordered set of phases, each with an Expectation, a Milestone and a Phase Acceptance section (authored per adr-9). itd-2609211913453478 rules that phases and milestones are retired, sequencing is dependencies plus the lifecycle shelves, and adr-9 is superseded. A negotiator for a retired concept cannot be built against the current vocabulary, so both records cannot stand.

Evidence: .abcd/work/reviews/2026-10-26-consistency/00-summary.md, finding 1193.

Grounds

  • declined: Closed in the 2026-10-27 triage (dcn-2610271112330536) as a duplicate of iss-2610262034220886. Same draft edit as iss-2610262034220886, set against a different statement of the same current state.

Frontmatter

idiss-2610262044146391
typeissue
lifecyclewontfix
severitymajor

References2

mentions3