This is the record of an abcd-managed repository

abcdBetav0.16.2 · 2026-11-06

Development record

itd-41 builds a negotiator over ordered phases with Expectation, Milestone and Phase Acceptance; the disembark page says sequence is dependencies plus the lifecycle shelves, and phases and milestones are retired.

issuewontfixminoriss-2610262033041268

itd-41 builds a negotiator over ordered phases with Expectation, Milestone and Phase Acceptance; the disembark page says sequence is dependencies plus the lifecycle shelves, and phases and milestones are retired.

A premise contradiction (severity minor) found by the cross-document consistency pass.

  • End A: .abcd/development/intents/drafts/itd-41-phase-negotiator.md:30 — "proposes an ordered set of phases, each with a draft ## Expectation, ## Milestone, and ## Phase Acceptance"
  • End B: .abcd/development/brief/04-surfaces/02-disembark.md:18 — "sequence is dependencies plus the lifecycle shelves ([adr-2609212115255771] (../../decisions/adrs/2609212115255771-phases-and-milestones-are-retired.md))"

Everything itd-41 outputs is a phase plan. It proposes ordered phases, each with a draft ## Expectation, ## Milestone and ## Phase Acceptance, grounds costs in phase-acceptance bullets, and leaves the product thinker to write the roadmap/phases/phase-N files under adr-9. The disembark page says sequence is dependencies plus the lifecycle shelves, citing adr-2609212115255771 (phases and milestones are retired), and calls the Phase 6 document retired. A negotiator over phases presupposes a layer the brief says is gone.

Evidence: .abcd/work/reviews/2026-10-26-consistency/00-summary.md, finding 356.

Grounds

  • declined: Closed in the 2026-10-27 triage (dcn-2610271112330536) as a duplicate of iss-2610262034220886. Same draft edit as iss-2610262034220886, set against a different statement of the same current state.

Frontmatter

idiss-2610262033041268
typeissue
lifecyclewontfix
severityminor

References1

mentions4