Development record
itd-41 builds a negotiator over ordered phases with Expectation, Milestone and Phase Acceptance; the disembark page says sequence is dependencies plus the lifecycle shelves, and phases and milestones are retired.
itd-41 builds a negotiator over ordered phases with Expectation, Milestone and Phase Acceptance; the disembark page says sequence is dependencies plus the lifecycle shelves, and phases and milestones are retired.
A premise contradiction (severity minor) found by the cross-document consistency pass.
- End A:
.abcd/development/intents/drafts/itd-41-phase-negotiator.md:30— "proposes an ordered set of phases, each with a draft## Expectation,## Milestone, and## Phase Acceptance" - End B:
.abcd/development/brief/04-surfaces/02-disembark.md:18— "sequence is dependencies plus the lifecycle shelves ([adr-2609212115255771] (../../decisions/adrs/2609212115255771-phases-and-milestones-are-retired.md))"
Everything itd-41 outputs is a phase plan. It proposes ordered phases, each with a draft ## Expectation, ## Milestone and ## Phase Acceptance, grounds costs in phase-acceptance bullets, and leaves the product thinker to write the roadmap/phases/phase-N files under adr-9. The disembark page says sequence is dependencies plus the lifecycle shelves, citing adr-2609212115255771 (phases and milestones are retired), and calls the Phase 6 document retired. A negotiator over phases presupposes a layer the brief says is gone.
Evidence: .abcd/work/reviews/2026-10-26-consistency/00-summary.md, finding 356.
Grounds
- declined: Closed in the 2026-10-27 triage (dcn-2610271112330536) as a duplicate of iss-2610262034220886. Same draft edit as iss-2610262034220886, set against a different statement of the same current state.
Frontmatter
| id | iss-2610262033041268 |
|---|---|
| type | issue |
| lifecycle | wontfix |
| severity | minor |
.abcd/work/issues/wontfix/iss-2610262033041268-itd-41-builds-a-negotiator-over-ordered.md
open on GitHub ↗ · commit history ↗
References1
- itd-41abcd Tells You, Honestly, What a Phasing Choice Costsrelated
mentions4
- adr-9Phase as a product-reflection layer between brief and intent
- adr-2609212115255771Phases and milestones are retired: sequencing is dependencies rendered as status, the checkpoint is the derived release
- dcn-26102711123305362026-10-27 — The product thinker accepted on 2026-10-27 the triage of the 1301 records the 2026-10-26 consistency pass filed. The duplicates, the records a later record already settles, the ones that are no contradiction and the one already fixed are closed with each reader's reason. Every other record gets its fix as its remedy, the rulings' accepted answers included, so a drain can take it. The 45 major records left open are deferred past v0.15.1, because the brief's single-home rewrite rewrites or removes most of the passages they quote. The person ruled the major rulings one at a time; the minor rulings take their recommended answers.
- iss-2610262034220886itd-41 proposes ordered phases with Milestone and Phase Acceptance sections; the intent chapter says phases are retired.