Development record
itd-196 keys its cumulative and closing rehearsals on the phase; the reflect surface says the phase was retired and the release is the grain
itd-196 keys its cumulative and closing rehearsals on the phase; the reflect surface says the phase was retired and the release is the grain
A terminology drift (severity minor) found by the cross-document consistency pass.
- End A:
.abcd/development/intents/disciplines/itd-196-a-capability-is-rehearsed-end-to-end.md:36— "One full run of everything the phase set out to" - End B:
.abcd/development/brief/04-surfaces/09-reflect.md:14— "retired the phase; itd-24 decisions 4 and 5)"
itd-196 sets its second and third rehearsal rungs on the phase, ending with one full run of everything the phase set out to deliver. The reflect surface records that adr-2609212115255771 retired the phase and makes the release the unit a delivery is closed on. The discipline's rungs are keyed on a unit the brief says no longer exists, so when its closing rung is owed is undefined.
Evidence: .abcd/work/reviews/2026-10-26-consistency/00-summary.md, finding 461.
Grounds
- declined: Closed in the 2026-10-27 triage (dcn-2610271112330536) as a duplicate of iss-2610262042291241. Same unit problem in itd-196 as iss-2610262042291241, cited against the reflect surface.
Frontmatter
| id | iss-2610262033596296 |
|---|---|
| type | issue |
| lifecycle | wontfix |
| severity | minor |
.abcd/work/issues/wontfix/iss-2610262033596296-itd-196-keys-its-cumulative-and-closing.md
open on GitHub ↗ · commit history ↗
References1
- itd-196A capability is rehearsed end to end before it ships, over a real tree, in a throwaway snapshotrelated
mentions4
- adr-2609212115255771Phases and milestones are retired: sequencing is dependencies rendered as status, the checkpoint is the derived release
- dcn-26102711123305362026-10-27 — The product thinker accepted on 2026-10-27 the triage of the 1301 records the 2026-10-26 consistency pass filed. The duplicates, the records a later record already settles, the ones that are no contradiction and the one already fixed are closed with each reader's reason. Every other record gets its fix as its remedy, the rulings' accepted answers included, so a drain can take it. The 45 major records left open are deferred past v0.15.1, because the brief's single-home rewrite rewrites or removes most of the passages they quote. The person ruled the major rulings one at a time; the minor rulings take their recommended answers.
- iss-2610262042291241The glossary calls the phase a retired sequencing unit; the rehearsal discipline builds its rungs on live phases
- itd-24Completed Releases Get A Retrospective