Development record
People who think in Emacs can edit the brief with Emacs keys
Press Release
People who think in Emacs can edit the brief with Emacs keys. On abcdesign.app, anyone in a live brief session can switch the brief editor to Emacs keys in the page's settings; it is off unless they turn it on, and it is remembered for them on that browser. With it on, the editor works the way an Emacs user's hands expect on every computer, Mac, Windows or Linux: Ctrl-Space sets the mark, Ctrl-W and Alt-W cut and copy, Ctrl-Y pastes, Ctrl-S searches, Ctrl-A and Ctrl-E go to the start and end of a line, Ctrl-K cuts to the end of the line. Alice, a solo founder who writes everything in Emacs, turns it on once and edits the press release without reaching for the mouse; Bob, who has never used Emacs, never sees it unless they turn it on.
Why This Matters
Why this matters to the user — replace before planning.
Mechanism
Prompted (the claim-recording gradient): why the authors expect this to work, as a falsifiable "we expect X because Y" — not the outcome restated. Replace this line with the claim, or with the exact token
None stated.alone on its line to record the claim as considered and declined.
Scope Conditions
Required (the claim-recording gradient): the population, platform, scale, or assumptions this claim holds under, one per top-level bullet —
abcd intent planstamps each with a persistent identity. Replace this line with those bullets, or with the exact tokenNone stated.alone on its line.
Acceptance Criteria
Required (the itd-1 discipline): add at least one Given-When-Then bullet describing the verifiable bar for "shipped" before this draft can be planned.
Open Questions
None recorded yet.
Audit Notes
Empty. Populated by intent-auditor when intent moves to shipped/.
Frontmatter
| id | itd-2610161904178040 |
|---|---|
| type | intent |
| lifecycle | drafts |
| severity | minor |
.abcd/development/intents/drafts/itd-2610161904178040-people-who-think-in-emacs-can-edit-the.md
open on GitHub ↗ · commit history ↗
References1
- itd-2610091016262335A team edits its brief together live during a call, on abcdesign.app or on the host's own computerblocked by
mentions1
- itd-1Every Intent Has Acceptance Criteria; Every Audit Verifies Them