This is the record of an abcd-managed repository

abcdBetav0.16.2 · 2026-11-06

Development record

abcd adjusts how many preflights run at once from what it recorded

intentdraftsminoritd-2610262141001890

Press Release

abcd adjusts how many preflights a machine runs at once from its record of how earlier ones behaved: it lowers the number when tests time out or runs stretch well past their usual time, and raises it again, a step at a time, while runs finish comfortably inside their limits. Nobody adjusts the number by hand: a person may name a starting default, and abcd uses even that only once it has measured what the machine can take. abcd keeps the number it works out in a file of its own, never in the person's settings, and a repository can never raise it. Each change is written down with the runs it rests on, so the person can read why and override it.

Why This Matters

Why this matters to the user — replace before planning.

Mechanism

Prompted (the claim-recording gradient): why the authors expect this to work, as a falsifiable "we expect X because Y" — not the outcome restated. Replace this line with the claim, or with the exact token None stated. alone on its line to record the claim as considered and declined.

Scope Conditions

Required (the claim-recording gradient): the population, platform, scale, or assumptions this claim holds under, one per top-level bullet — abcd intent plan stamps each with a persistent identity. Replace this line with those bullets, or with the exact token None stated. alone on its line.

Acceptance Criteria

Required (the itd-1 discipline): add at least one Given-When-Then bullet describing the verifiable bar for "shipped" before this draft can be planned.

Decisions

  • The number allowed at once is adjusted automatically, never by hand; a person may name a starting default, used only once the machine's capacity has been measured (product thinker, 26 October 2026, at the planning interview of itd-2610262127138979). This reverses the standing rule that the person writes the number (the LOAD rules, dcn-2610161814279204), and the cap at 2 is lifted only on measured evidence that 2 still leaves room; both are settled at this intent's planning.

Open Questions

None recorded yet.

Audit Notes

Empty. Populated by intent-auditor when intent moves to shipped/.

Frontmatter

iditd-2610262141001890
typeintent
lifecycledrafts
severityminor

References2

mentions11