This is the record of an abcd-managed repository

abcdBetav0.16.2 · 2026-11-06

Development record

The press release's acceptance criteria have the bare quoted create complete an interview, and embark open with a press-release interview; the verification matrix says bare quoted text runs no interview and stages the embark interview.

issuewontfixminoriss-2610262031168083

The press release's acceptance criteria have the bare quoted create complete an interview, and embark open with a press-release interview; the verification matrix says bare quoted text runs no interview and stages the embark interview.

A premise contradiction (severity minor) found by the cross-document consistency pass.

  • End A: .abcd/development/brief/01-product/01-press-release.md:42 — "(canonical bare quoted create), when the interview completes"
  • End B: .abcd/development/brief/06-delivery/02-verification-matrix.md:53 — "Bare quoted text runs no interview"

The press release's criterion for the canonical bare quoted create reads '(canonical bare quoted create), when the interview completes', after which a draft with a persona-registry quote exists, and its scope has embark run a press-release interview with the user. The matrix's Intent capture row says 'Bare quoted text runs no interview': the text becomes the press release and the other sections are seeded as prompts; its Embark press-release interview row is staged, what ships being probe-then-write. The product's own acceptance contract assumes interviews the delivered design rules out.

Evidence: .abcd/work/reviews/2026-10-26-consistency/00-summary.md, finding 109.

Grounds

  • declined: Closed in the 2026-10-27 triage (dcn-2610271112330536) as a duplicate of iss-2610262030485894. Same criterion at the same line (interview completes after the bare quoted create) set against the verification matrix instead of the intent chapter.

Frontmatter

idiss-2610262031168083
typeissue
lifecyclewontfix
severityminor

mentions2