This is the record of an abcd-managed repository

abcdBetav0.16.2 · 2026-11-06

Development record

itd-85 has `prepare-this-repo` read `abcd audit --json`; the board chapter says the install's preparation workflow runs `abcd lint` for its audit half.

issuewontfixminoriss-2610262034164290

itd-85 has prepare-this-repo read abcd audit --json; the board chapter says the install's preparation workflow runs abcd lint for its audit half.

A premise contradiction (severity minor) found by the cross-document consistency pass.

  • End A: .abcd/development/intents/drafts/itd-85-audit-verb.md:31 — "prepare-this-repo Phase 2 consumes abcd audit --json in place of the hand-produced gap report"
  • End B: .abcd/development/brief/04-surfaces/08-abcd.md:148 — "its audit half runs abcd lint, and its adoption half is binary-backed"

itd-85 connects onboarding to a new abcd audit --json report, read in prepare-this-repo Phase 2. 08-abcd.md says the preparation workflow, now on the ahoy page, already does its audit half with abcd lint. The two documents disagree about what onboarding's audit step runs.

Evidence: .abcd/work/reviews/2026-10-26-consistency/00-summary.md, finding 483.

Grounds

  • declined: Closed in the 2026-10-27 triage (dcn-2610271112330536) as a duplicate of iss-2610262033013099. Same draft edit as iss-2610262033013099, set against a different statement of the same current state.

Frontmatter

idiss-2610262034164290
typeissue
lifecyclewontfix
severityminor

References1

mentions2