This is the record of an abcd-managed repository

abcdBetav0.16.2 · 2026-11-06

Development record

itd-85 wires a new abcd audit verb into prepare-this-repo's Phase 2 as the conformance report; the ahoy page already gives that phase to abcd lint's JSON form.

issueopenminoriss-2610262033013099

itd-85 wires a new abcd audit verb into prepare-this-repo's Phase 2 as the conformance report; the ahoy page already gives that phase to abcd lint's JSON form.

A scope leakage (severity minor) found by the cross-document consistency pass.

  • End A: .abcd/development/intents/drafts/itd-85-audit-verb.md:31 — "Wiring: prepare-this-repo Phase 2 consumes abcd audit --json in place of the hand-produced gap report."
  • End B: .abcd/development/brief/04-surfaces/01-ahoy.md:362 — "Run abcd lint in its JSON form, supplement it, write the gap report to the target's .abcd/.work.local/scratch/"

itd-85 makes abcd audit the read-only check of repository conformance (three-tier layout, conventions router, decision durability, docs currency) and has prepare-this-repo's Phase 2 consume abcd audit --json in place of the hand-produced gap report. The ahoy page says the preparation, now part of the install's plugin page, runs abcd lint in its JSON form at its conformance-lint phase, as the engine-backed conformance core, and writes the gap report from that. Two verbs claim the same conformance report for the same phase, and the page itd-85 wires into is retired.

Evidence: .abcd/work/reviews/2026-10-26-consistency/00-summary.md, finding 350.

Frontmatter

idiss-2610262033013099
typeissue
lifecycleopen
severityminor

References1

mentions2