This is the record of an abcd-managed repository

abcdBetav0.16.2 · 2026-11-06

Development record

The audit draft wires into prepare-this-repo Phase 2, but prepare-this-repo has folded into ahoy install with no alias

issuewontfixminoriss-2610262044229426

The audit draft wires into prepare-this-repo Phase 2, but prepare-this-repo has folded into ahoy install with no alias

A sequencing impossibility (severity minor) found by the cross-document consistency pass.

  • End A: .abcd/development/intents/drafts/itd-85-audit-verb.md:31 — "Wiring: prepare-this-repo Phase 2 consumes abcd audit --json in place of the hand-produced gap report."
  • End B: .abcd/development/intents/shipped/itd-2610090831227812-a-person-who-types-abcd-sees-only-the.md:48 — "prepare-this-repo folds into ahoy install; consult, ingest, memory and source merge into library"

itd-85's wiring depends on prepare-this-repo Phase 2 consuming abcd audit --json. itd-2610090831227812 folds prepare-this-repo into ahoy install, and under adr-40 no old name survives. The surface the draft wires into no longer exists.

Evidence: .abcd/work/reviews/2026-10-26-consistency/00-summary.md, finding 1201.

Grounds

  • declined: Closed in the 2026-10-27 triage (dcn-2610271112330536) as a duplicate of iss-2610262033013099. Same draft edit as iss-2610262033013099, set against a different statement of the same current state.

Frontmatter

idiss-2610262044229426
typeissue
lifecyclewontfix
severityminor

References2

mentions3