Development record
A draft filed for later wants every managed project to publish the public record site; 22-site already sets up and publishes that site for any managed repository.
A draft filed for later wants every managed project to publish the public record site; 22-site already sets up and publishes that site for any managed repository.
A scope leakage (severity minor) found by the cross-document consistency pass.
- End A:
.abcd/development/intents/drafts/itd-2610040754453237-any-team-that-manages-its-project-with.md:18— "Any team that manages its project with abcd publishes the public record site for their own project" - End B:
.abcd/development/brief/04-surfaces/22-site.md:48— "Setting up takes a repository abcd manages from the checkout to a live address"
itd-2610040754453237 says any team that manages its project with abcd publishes the public record site for its own project as abcd publishes its own, and records it as a separate intent for later, not now. 22-site says setting up takes a repository abcd manages from the checkout to a live address, and that every repository gets the same record pages, the timeline among them. The same ground is claimed by a shipped surface and by an unplanned draft, so it is either delivered or still owed, and the record says both.
Evidence: .abcd/work/reviews/2026-10-26-consistency/00-summary.md, finding 616.
Frontmatter
| id | iss-2610262036000485 |
|---|---|
| type | issue |
| lifecycle | open |
| severity | minor |
.abcd/work/issues/open/iss-2610262036000485-a-draft-filed-for-later-wants-every.md
open on GitHub ↗ · commit history ↗
References1
- itd-2610040754453237The public record site for every abcd-managed projectrelated
mentions2
- iss-2610262042428344A draft for later and a planned intent both publish any managed project's record site
- iss-2610262043356566itd-2610040754453237 files the record site for every managed project as later work; itd-2609061543533170 already ships those pages for every managed repository