Development record
itd-2610040754453237 files the record site for every managed project as later work; itd-2609061543533170 already ships those pages for every managed repository
itd-2610040754453237 files the record site for every managed project as later work; itd-2609061543533170 already ships those pages for every managed repository
A scope leakage (severity minor) found by the cross-document consistency pass.
- End A:
.abcd/development/intents/drafts/itd-2610040754453237-any-team-that-manages-its-project-with.md:18— "publishes the public record site for their own project" - End B:
.abcd/development/intents/shipped/itd-2609061543533170-abcd-sets-up-a-managed-repository-s.md:43— "landing, explorer, record pages, graph, timeline, glossary and status render for every managed repository from its own text"
The draft promises that any team managing its project with abcd publishes the public record site, timeline included, as abcd publishes its own, filed for later. The shipped site intent already renders landing, explorer, record pages, graph, timeline, glossary and status for every managed repository from its own text. The same ground is claimed twice, and the draft does not say what it adds beyond the shipped pages.
Evidence: .abcd/work/reviews/2026-10-26-consistency/00-summary.md, finding 1148.
Grounds
- declined: Closed in the 2026-10-27 triage (dcn-2610271112330536) as a duplicate of iss-2610262036000485. Same End A and same remedy; this record names the shipped site intent as the overlapping holder.
Frontmatter
| id | iss-2610262043356566 |
|---|---|
| type | issue |
| lifecycle | wontfix |
| severity | minor |
.abcd/work/issues/wontfix/iss-2610262043356566-itd-2610040754453237-files-the-record.md
open on GitHub ↗ · commit history ↗
References2
- itd-2609061543533170One verb takes a managed repository's site from the checkout to a live addressrelated
- itd-2610040754453237The public record site for every abcd-managed projectrelated
mentions2
- dcn-26102711123305362026-10-27 — The product thinker accepted on 2026-10-27 the triage of the 1301 records the 2026-10-26 consistency pass filed. The duplicates, the records a later record already settles, the ones that are no contradiction and the one already fixed are closed with each reader's reason. Every other record gets its fix as its remedy, the rulings' accepted answers included, so a drain can take it. The 45 major records left open are deferred past v0.15.1, because the brief's single-home rewrite rewrites or removes most of the passages they quote. The person ruled the major rulings one at a time; the minor rulings take their recommended answers.
- iss-2610262036000485A draft filed for later wants every managed project to publish the public record site; 22-site already sets up and publishes that site for any managed repository.