This is the record of an abcd-managed repository

abcdBetav0.16.2 · 2026-11-06

Development record

The macOS leg of the check job in ci.yml cancels merge-group runs at its 70-minute ceiling: on 2026-10-28 run 40752008734 (PR #1196's merge group) had check (macos-latest) cancelled after about 71 minutes, from 19:11:30Z to 20:22:05Z, and the queue dropped the group with failed_checks. That day's passing merge-group runs took roughly 46 to 68 minutes, so the leg runs near its cap and each cancel rebuilds every group queued behind it. The lasting remedy is a faster suite (iss-2610181711260494, resolved by the raise to 70, which named a faster race pass, iss-2610181757540736, as the longer lever).

issueresolvedmajoriss-2610282035340363

The macOS leg of the check job in ci.yml cancels merge-group runs at its 70-minute ceiling: on 2026-10-28 run 40752008734 (PR #1196's merge group) had check (macos-latest) cancelled after about 71 minutes, from 19:11:30Z to 20:22:05Z, and the queue dropped the group with failed_checks. That day's passing merge-group runs took roughly 46 to 68 minutes, so the leg runs near its cap and each cancel rebuilds every group queued behind it. The lasting remedy is a faster suite (iss-2610181711260494, resolved by the raise to 70, which named a faster race pass, iss-2610181757540736, as the longer lever).

Frontmatter

idiss-2610282035340363
typeissue
lifecycleresolved
severitymajor

mentions3